§65.41 Skill requirements: Facility ratings.
Each applicant for a facility rating at an air traffic control tower must have passed a practical test on each item listed in ยง65.37 of this part that is applicable to each operating position at the control tower at which the rating is sought.
FAR/AIM content updated June 10, 2022